<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd" xmlns:googleplay="http://www.google.com/schemas/play-podcasts/1.0"><channel><title><![CDATA[Built to Absorb]]></title><description><![CDATA[Where large programmes leak the value they were funded to deliver, and how the best operators capture it. One leak, one fix, every week.]]></description><link>https://www.builttoabsorb.com</link><image><url>https://substackcdn.com/image/fetch/$s_!5k-f!,w_256,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Faf81540f-ccf2-447f-8da4-f13538cf9568_1254x1254.png</url><title>Built to Absorb</title><link>https://www.builttoabsorb.com</link></image><generator>Substack</generator><lastBuildDate>Tue, 24 Nov 2026 18:52:13 GMT</lastBuildDate><atom:link href="https://www.builttoabsorb.com/feed" rel="self" type="application/rss+xml"/><copyright><![CDATA[Ricky Asemota]]></copyright><language><![CDATA[en]]></language><webMaster><![CDATA[builttoabsorb@substack.com]]></webMaster><itunes:owner><itunes:email><![CDATA[builttoabsorb@substack.com]]></itunes:email><itunes:name><![CDATA[Ricky Asemota]]></itunes:name></itunes:owner><itunes:author><![CDATA[Ricky Asemota]]></itunes:author><googleplay:owner><![CDATA[builttoabsorb@substack.com]]></googleplay:owner><googleplay:email><![CDATA[builttoabsorb@substack.com]]></googleplay:email><googleplay:author><![CDATA[Ricky Asemota]]></googleplay:author><itunes:block><![CDATA[Yes]]></itunes:block><item><title><![CDATA[The Capacity Problem]]></title><description><![CDATA[When everything is a priority, nothing gets absorbed]]></description><link>https://www.builttoabsorb.com/p/the-capacity-problem</link><guid isPermaLink="false">https://www.builttoabsorb.com/p/the-capacity-problem</guid><dc:creator><![CDATA[Ricky Asemota]]></dc:creator><pubDate>Wed, 18 Nov 2026 05:01:15 GMT</pubDate><enclosure url="https://api.substack.com/feed/podcast/225347172/f796013e364a2159a9a6a10bac16823f.mp3" length="0" type="audio/mpeg"/><content:encoded><![CDATA[<p>This week&#8217;s episode is about the one resource no organisation budgets for. If you&#8217;ve watched or listened, you have the argument and the roadmap where every row was priority one. I won&#8217;t repeat them here.</p><p>This issue does two things the episode doesn&#8217;t. It takes on the best objection to the argument. And it gives you a way to check, this week, whether your portfolio fits the people who have to carry it.</p><p><strong>The objection</strong></p><p>The fair challenge goes like this. Cutting to three or four priorities works for a small team. A large organisation genuinely has to run dozens of things at once. Regulation, operations, growth, the change the board asked for. Nobody gets to pick four.</p><p>That&#8217;s true. The number does scale with size, and an organisation of fifty thousand people can run more change than a team of fifty.</p><p>But the limit was never the organisation&#8217;s. It&#8217;s the people who have to absorb the change. In most places, the same few senior people and the same front-line teams end up carrying most of it, whatever the org chart says. The finance team that has to adopt the new system is the same finance team closing the year, running the audit and testing the new controls.</p><p>So don&#8217;t count priorities across the whole organisation. Count them at the team receiving them. A programme with thirty initiatives can be fine if they land on thirty different teams. Five can break a team if all five land on it in the same quarter.</p><p>And the mandatory work still counts. Regulatory change uses the same attention as everything else. It just gets spent first, which means the optional list has to shrink further, not stay the same.</p><p>Most roadmaps are written from the side doing the sending. Capacity only shows up on the side doing the receiving.</p><p><strong>The test: a load sheet for one team</strong></p><p>Pick the one team that will absorb the most change in the next ninety days. Not the team running the programme. The team whose work has to change.</p><p>List every change landing on them in that window. From every source, not just yours. New systems, new processes, reorganisations, regulatory work, the pilot someone else is running.</p><p>For each one, write three lines.</p><ul><li><p>Roughly how many hours a week it asks of them.</p></li><li><p>What they&#8217;ve been told to stop doing to make room.</p></li><li><p>What it depends on, and whether that exists yet.</p></li></ul><p>Then read it three ways.</p><ul><li><p><strong>Add up the hours.</strong> If the total is more than they could spare without dropping their day job, the portfolio doesn&#8217;t fit, however good each item is.</p></li><li><p><strong>Read the stop column.</strong> If it&#8217;s empty, you&#8217;ve added work without a budget. Every change takes attention from something. If nobody chose what, the team will choose for you, usually by quietly letting the newest thing slide.</p></li><li><p><strong>Read the dependencies.</strong> If a change depends on something that doesn&#8217;t exist yet, move it back. Starting early doesn&#8217;t save time. It just spends attention while it waits.</p></li></ul><p>Then take the sheet to the people who sponsor the changes on it, together, not one at a time. Most of them have never seen the whole load. Each one only sees their own line, and their own line always looks reasonable.</p><p><strong>The line to remember</strong></p><p>When everything is a priority, nothing gets enough attention to become capability.</p><p><strong>Watch or listen</strong></p><p>The full episode is at the top of this post. It opens with a roadmap I inherited, where every single row was marked priority one.</p><p>You can also listen on <a href="https://podcasts.apple.com/us/podcast/built-to-absorb/id6806991972">Apple Podcasts</a> or <a href="https://open.spotify.com/show/7nwgw6S59jbshSNyLYsUeF">Spotify</a>, or watch on <a href="https://youtu.be/JqJb3maAs6I">YouTube</a>.</p><p>If you build the load sheet, reply and tell me how many hours a week your busiest team was being asked to find.</p><p><em>Built to Absorb. One problem, one fix, every week.</em></p>]]></content:encoded></item><item><title><![CDATA[The Next Decade]]></title><description><![CDATA[An announcement is not evidence of absorption]]></description><link>https://www.builttoabsorb.com/p/the-next-decade</link><guid isPermaLink="false">https://www.builttoabsorb.com/p/the-next-decade</guid><dc:creator><![CDATA[Ricky Asemota]]></dc:creator><pubDate>Wed, 11 Nov 2026 05:01:04 GMT</pubDate><enclosure url="https://api.substack.com/feed/podcast/221658483/9aa912208d55937d2222134fa64c984d.mp3" length="0" type="audio/mpeg"/><content:encoded><![CDATA[<p>This week&#8217;s episode is the halfway mark of the season, and it turns on one line. If you&#8217;ve watched or listened, you have the read and the four things I&#8217;d watch for. I won&#8217;t repeat them here.</p><p>This issue does two things the episode doesn&#8217;t. It takes on the best objection to that line. And it gives you a ledger you can build in about an hour, to see whether your own organisation&#8217;s announcements are turning into delivery.</p><p><strong>The objection</strong></p><p>The fair challenge goes like this. Announcements matter. They commit leaders in public. They attract the people you need. They release the money. Without the launch, there&#8217;s nothing to absorb in the first place.</p><p>I agree. An announcement is a commitment, and commitment is useful. I&#8217;ve stood at the back of those rooms, and the ambition in them was real. Nothing in this season argues against ambition.</p><p>The problem isn&#8217;t announcing. It&#8217;s scoring the announcement as the result.</p><p>Once the launch is what gets rewarded, attention leaves with the audience. The work of absorbing it, the ordinary weeks where the new way either shows up or doesn&#8217;t, gets less of everything. Less time, less money, less senior attention. Not because anyone decided to starve it. Because nobody claps for it.</p><p>So keep the announcement. Just stop counting it. Count what it changed a year later, in a normal week, with nobody watching.</p><p>An announcement is the start of the evidence. It isn&#8217;t the evidence.</p><p><strong>The ledger: an hour with your last eighteen months</strong></p><p>List everything your organisation announced in the last eighteen months. Programmes, platforms, reorganisations, targets. Anything that got a launch.</p><p>For each one, write three lines.</p><ul><li><p>What was promised.</p></li><li><p>Where it would show up in an ordinary week if it had landed. A decision made differently. A meeting that now exists. A number that moved. A task nobody does any more.</p></li><li><p>What you can actually point to today.</p></li></ul><p>Then sort them.</p><ul><li><p><strong>Absorbed.</strong> You can point to the ordinary-week evidence, and it would still be there if the sponsor left.</p></li><li><p><strong>Adopted on paper.</strong> The structure exists. The org chart, the licences, the steering group. The work underneath still runs the old way.</p></li><li><p><strong>Announced only.</strong> The launch happened. Nothing since.</p></li></ul><p>Be fair about timing. Some programmes are built to land over years, and it would be easy to score them all as failures. Score each one against what should be visible by now, not against the finish line.</p><p>Then take the announced-only list to the people who launched them, one at a time. For each one, either put a name and a date on the first ordinary-week change, or say out loud that it&#8217;s been dropped. Dropping it honestly costs less than carrying it as a promise. Every unkept announcement makes the next one easier to ignore.</p><p>The adopted-on-paper column is where the second half of this season lives. Those are the failures you can&#8217;t point at, and next week starts with the first of them: the load nobody budgets for.</p><p><strong>The line to remember</strong></p><p>An announcement is not evidence of absorption.</p><p><strong>Watch or listen</strong></p><p>The full episode is at the top of this post. It opens on a launch, the good kind, with the stage and the countdown, and then on the morning after, when the real work either absorbs what was announced or doesn&#8217;t.</p><p>You can also listen on <a href="https://podcasts.apple.com/us/podcast/built-to-absorb/id6806991972">Apple Podcasts</a> or <a href="https://open.spotify.com/show/7nwgw6S59jbshSNyLYsUeF">Spotify</a>, or watch on <a href="https://youtu.be/QwAAUBrS-R0">YouTube</a>.</p><p>If you build the ledger, reply and tell me which column was longest.</p><p><em>Built to Absorb. One problem, one fix, every week.</em></p>]]></content:encoded></item><item><title><![CDATA[Institutions That Outlast]]></title><description><![CDATA[Most transformations don't fail at the launch. They fail at the handover.]]></description><link>https://www.builttoabsorb.com/p/institutions-that-outlast</link><guid isPermaLink="false">https://www.builttoabsorb.com/p/institutions-that-outlast</guid><dc:creator><![CDATA[Ricky Asemota]]></dc:creator><pubDate>Wed, 04 Nov 2026 05:00:48 GMT</pubDate><enclosure url="https://api.substack.com/feed/podcast/221658238/0f3e30dc0382cb52023dced5c612056f.mp3" length="0" type="audio/mpeg"/><content:encoded><![CDATA[<p>This week&#8217;s episode is about what&#8217;s still standing after the people who built something have gone. If you&#8217;ve watched or listened, you have the argument and the 8:59 story so I won&#8217;t repeat them here.</p><p>This issue does two things the episode doesn&#8217;t. It takes on the best objection to the argument. And it gives you a test for your own rhythms that you can run this week, without waiting for anyone to leave.</p><p><strong>The objection</strong></p><p>The fair challenge goes like this. Organisations aren&#8217;t short of meetings that outlive the people who started them. They&#8217;re drowning in them. A ritual that survives its sponsor isn&#8217;t always a win. Sometimes it&#8217;s just a habit nobody has the authority to stop.</p><p>That&#8217;s true, and it&#8217;s worth taking seriously. Survival on its own proves nothing. Most diaries are full of meetings that keep running long after anyone can say why. They survived the handover too. Nobody would call them a capability.</p><p>So the test isn&#8217;t whether a rhythm keeps running. It&#8217;s whether it still forces a decision.</p><p>The meeting in the episode survived because it did one thing every week. It put what was off track on a wall and made someone own the fix by Friday. Take that away and it would have deserved to die, whoever was in the chair.</p><p>That&#8217;s why a rhythm needs a written reason, not just a calendar slot. What it&#8217;s for. What decision it forces. What breaks the day it stops. And the line most people leave out: what would tell you it&#8217;s time to stop it. A reason that includes its own exit is what separates a capability from a ritual.</p><p>A rhythm with a reason survives the handover. A rhythm without one either dies with its sponsor or lives on as a ritual. Neither is a capability.</p><p><strong>The test: five rhythms, four lines each</strong></p><p>List the five recurring meetings your results depend on most. The weekly performance review, the monthly pipeline call, whatever actually moves things in your part of the organisation.</p><p>For each one, write four lines.</p><ul><li><p>Who calls it.</p></li><li><p>The decision it exists to force, in one sentence.</p></li><li><p>What would break if it stopped.</p></li><li><p>The last time it ran without the person who started it.</p></li></ul><p>Then sort them into three groups.</p><ul><li><p><strong>Runs itself.</strong> Someone else has chaired it, it went ahead anyway, and anyone in the room could give you the one-sentence reason. That&#8217;s a capability.</p></li><li><p><strong>Runs on a person.</strong> It only happens when one name calls it. That&#8217;s a habit, and it leaves when they do.</p></li><li><p><strong>Runs on memory.</strong> It happens every week, but nobody can say what decision it forces. That one won&#8217;t survive a new leader, and maybe it shouldn&#8217;t.</p></li></ul><p>Now take the one that matters most and write its reason down. Half a page is plenty. What it&#8217;s for, what it decides, what breaks without it, and what would tell you it&#8217;s time to stop. Put it where the next person will find it before they find the cancel button.</p><p>Then hand the chair to someone else for a month, while the person who started it is still around to watch. That&#8217;s the cheapest handover you&#8217;ll ever run, because you get to see it fail while there&#8217;s still someone in the building who can fix it.</p><p>And take a hard look at anything in the third group. Some of those meetings should be rewritten. Some should be stopped, on purpose, with a sentence saying why.</p><p><strong>The line to remember</strong></p><p>The test of the work was never how it launched. It&#8217;s what&#8217;s still standing the year after you&#8217;ve gone.</p><p><strong>Watch or listen</strong></p><p>The full episode is at the top of this post. It&#8217;s the quietest one of the season, built around a Monday meeting I walked past at 8:59 one morning, months after I&#8217;d left, and found still running without me.</p><p>You can also listen on <a href="https://podcasts.apple.com/us/podcast/built-to-absorb/id6806991972">Apple Podcasts</a> or <a href="https://open.spotify.com/show/7nwgw6S59jbshSNyLYsUeF">Spotify</a>, or watch on <a href="https://youtu.be/HAXCnAI893o">YouTube</a>.</p><p>If you run the test, reply and tell me how many of your five ran on memory.</p><p><em>Built to Absorb. One problem, one fix, every week.</em></p>]]></content:encoded></item><item><title><![CDATA[The Foundations Problem]]></title><description><![CDATA[You can buy the technology. You cannot buy the trust.]]></description><link>https://www.builttoabsorb.com/p/the-foundations-problem</link><guid isPermaLink="false">https://www.builttoabsorb.com/p/the-foundations-problem</guid><dc:creator><![CDATA[Ricky Asemota]]></dc:creator><pubDate>Wed, 28 Oct 2026 05:01:01 GMT</pubDate><enclosure url="https://api.substack.com/feed/podcast/221654610/bd886a3df8580b3621ab9bebddad0e5e.mp3" length="0" type="audio/mpeg"/><content:encoded><![CDATA[<p>Last week&#8217;s question was whether the work was being delivered. This week&#8217;s episode asks the harder one underneath it: <em>&#8220;Could you even tell?&#8221;</em> If you&#8217;ve watched or listened, you have the argument and the night I learned it. I won&#8217;t repeat them here.</p><p>This issue does two things the episode doesn&#8217;t. It takes on the objection I hear most often. And it gives you a test you can run on your own foundations this week without touching a single system.</p><p><strong>The objection</strong></p><p>The fair challenge goes like this: <strong>Data is never clean. If you wait for one perfect source of truth before you launch, you&#8217;ll never launch anything. Fix it in flight.</strong></p><p>I agree with the first half. If the test were clean data, nothing would ever go live.</p><p>But the episode isn&#8217;t asking for clean data. It&#8217;s asking for an agreed number, and those are two different things.</p><p>Clean means right. Agreed means everyone in the room will act on it, flaws and all. You can launch on an imperfect number that everyone trusts, and improve it as you go. You can&#8217;t launch on two good numbers that disagree, because the first meeting after go-live stops being about what to do and becomes an argument about whose figure is real.</p><p>And it doesn&#8217;t have to be every number. Just the handful your launch will be judged on. If those don&#8217;t match, launching doesn&#8217;t save time. It schedules the argument for later, in public, when it&#8217;s more expensive to have.</p><p><em><strong>&#8220;Fix it in flight&#8221; </strong></em>works for most things. It doesn&#8217;t work for the instrument you&#8217;re steering by.</p><p><strong>The test: three numbers, three people</strong></p><p>Pick the three numbers your next big decision will depend on. Revenue at risk. Active users. Cost to serve. Whatever your board will actually act on.</p><p>Ask three people, separately, for each number. Use the same wording, ask in writing, and ask where they got it.</p><p>Then compare.</p><ul><li><p><strong>Same number, same source.</strong> That&#8217;s a foundation.</p></li><li><p><strong>Same number, different sources.</strong> That&#8217;s luck. It will come apart the first time something changes.</p></li><li><p><strong>Different numbers.</strong> There&#8217;s no foundation yet, whatever the dashboard looks like.</p></li></ul><p>Ask the same three people two more questions.</p><p>If this number moved the wrong way tomorrow, whose phone would you pick up? Three different names means nobody owns it.</p><p>And in your last review, how much of the hour went into reconciling figures instead of deciding? That&#8217;s what a missing foundation costs, every week, and it never shows up in a budget.</p><p>Then fix one number before the next meeting. Choose the source everyone will accept, not the best one. Agreement doesn&#8217;t make a number right. It makes it something you can fix together. Put one name against it, and write its definition in a single sentence nobody can read two ways.</p><p><strong>The line to remember: </strong><em><strong>&#8220;You can buy the technology. You cannot buy the trust.&#8221;</strong></em></p><p><strong>Watch or listen</strong></p><p>The full episode is at the top of this post. It opens on the night before a go-live I stopped, because two of my own people pulled the same core number from two systems and it didn&#8217;t match.</p><p>You can also listen on <a href="https://podcasts.apple.com/us/podcast/built-to-absorb/id6806991972">Apple Podcasts</a> or <a href="https://open.spotify.com/show/7nwgw6S59jbshSNyLYsUeF">Spotify</a>, or watch on <a href="https://youtu.be/Ru033Srze-E">YouTube</a>.</p><p>If you run the test, reply and tell me how many of your three numbers matched.</p><p><em>Built to Absorb. One problem, one fix, every week.</em></p>]]></content:encoded></item><item><title><![CDATA[The Delivery Gap]]></title><description><![CDATA[The most dangerous colour on your dashboard is green]]></description><link>https://www.builttoabsorb.com/p/the-delivery-gap</link><guid isPermaLink="false">https://www.builttoabsorb.com/p/the-delivery-gap</guid><dc:creator><![CDATA[Ricky Asemota]]></dc:creator><pubDate>Wed, 21 Oct 2026 05:00:47 GMT</pubDate><enclosure url="https://api.substack.com/feed/podcast/220929351/0c327303112b3c59da3b86ec6b695382.mp3" length="0" type="audio/mpeg"/><content:encoded><![CDATA[<p>This week&#8217;s episode is about the colour that hides the most risk on any programme board. If you&#8217;ve watched or listened, you have the argument and the story behind it. I won&#8217;t repeat them here.</p><p>This issue does two things the episode doesn&#8217;t. It takes on the best objection to the argument. And it gives you a way to find the decisions hiding under your own green this week.</p><p><strong>The objection</strong></p><p>The fair challenge goes like this. If you teach leaders to distrust green, you&#8217;ll drown your teams in reporting. Every line gets interrogated, the dashboard grows, and people learn that even good news earns a grilling. That&#8217;s how you make red less safe, not more.</p><p>It&#8217;s a real risk. The usual response to &#8220;don&#8217;t trust the colour&#8221; is more detail on everything. The packs get thicker. The meetings get longer. Nothing gets decided.</p><p>So don&#8217;t audit the colour. Ask one question of it: <em><strong>&#8220;What decision is this green standing on, and who made it?&#8221;</strong></em></p><p>On a line that&#8217;s genuinely on track, the answer takes ten seconds. The call was made, it has a name, and everyone in the room knows it. That green has earned its colour, and nobody should have to defend it again.</p><p>Sometimes the honest answer is &#8220;not yet, and here&#8217;s when.&#8221; That&#8217;s fine too. A date and a name is a decision about the decision.</p><p>The lines that can&#8217;t answer at all are the delivery gap. Not the ones running late. Late is visible. The dangerous ones are the lines where the work is moving, the colour is green, and nobody can point to the call that was supposed to be made.</p><p>One question asked of every green line costs less than a hundred reports. And it&#8217;s the only one that tells you whether the work is being decided or just described.</p><p><strong>The test: An afternoon with your dashboard</strong></p><p>Take your programme dashboard. Next to every green line, write three things: the decision it rests on, who made it, and when.</p><p>Then sort the lines into three groups.</p><ul><li><p><strong>Earned green.</strong> A named decision, an owner, a date. A decision to decide later counts, as long as it has a name and a date. Leave these alone.</p></li><li><p><strong>Soft green.</strong> Something was agreed, but nobody can say who owns it or when it was settled. These are the next to slip.</p></li><li><p><strong>Borrowed green.</strong> No decision at all, just activity that&#8217;s going well. This is red that hasn&#8217;t been said yet.</p></li></ul><p>Two more checks while you&#8217;re there.</p><p>Listen to your next review meeting. At the end, write down every decision that was made, with a name next to it. If the list is shorter than the agenda, the meeting was a briefing, not a review.</p><p>Then look back over the last three months of the board. When did a line turn red before anyone senior asked about it? If you can&#8217;t find one, red isn&#8217;t being reported in your organisation. It&#8217;s being discovered.</p><p>Take your borrowed greens to the next meeting, one at a time, and ask for the decision. Put a name and a date on each before anyone leaves the room.</p><p>And once the colours are honest, a harder question is waiting. Even if you trust the colour, could you trust the number underneath it? That&#8217;s next week.</p><p><strong>The line to remember</strong></p><p>Green isn&#8217;t the colour of progress. It&#8217;s the colour of a deferred decision.</p><p><strong>Watch or listen</strong></p><p>The full episode is at the top of this post. It opens with a status review where every line was green, and the expensive thing that was hiding under one of them.</p><p>You can also listen on <a href="https://podcasts.apple.com/us/podcast/built-to-absorb/id6806991972">Apple Podcasts</a> or <a href="https://open.spotify.com/show/7nwgw6S59jbshSNyLYsUeF">Spotify</a>, or watch on <a href="https://youtu.be/51eb4iGrLmw">YouTube</a>.</p><p>If you run the test, reply and tell me how many of your greens turned out to be borrowed.</p><p><em>Built to Absorb. One problem, one fix, every week.</em></p>]]></content:encoded></item><item><title><![CDATA[The Suitcase Problem]]></title><description><![CDATA[The capability you cannot afford to lose]]></description><link>https://www.builttoabsorb.com/p/the-suitcase-problem</link><guid isPermaLink="false">https://www.builttoabsorb.com/p/the-suitcase-problem</guid><dc:creator><![CDATA[Ricky Asemota]]></dc:creator><pubDate>Wed, 14 Oct 2026 05:00:46 GMT</pubDate><enclosure url="https://api.substack.com/feed/podcast/213678484/db5852219b61ad6560c02c2016b07aae.mp3" length="0" type="audio/mpeg"/><content:encoded><![CDATA[<p>This week&#8217;s episode is about the person your organisation can&#8217;t afford to lose, and why that can be either your greatest strength or your most expensive fragility. If you&#8217;ve watched or listened, you have the story and the argument. I won&#8217;t repeat them here.</p><p>This issue does two things the episode doesn&#8217;t. It takes on the best objection to the argument. And it gives you an audit you can run this week to find your own single points of failure, without waiting for anyone to resign.</p><p><strong>The objection</strong></p><p>The fair challenge goes like this. Some capability can&#8217;t be moved out of a person. Judgement. Relationships. The feel for when a number looks wrong. You can&#8217;t write that into a process, and if you try to turn your best person into a manual, you&#8217;ll probably lose them.</p><p>I agree with most of that. Judgement doesn&#8217;t transfer through documents. Nobody learns to make a hard call by reading how someone else made one. A handover file is useful, but it&#8217;s the least important part of the handover.</p><p>Judgement transfers through reps. Other people making the call, getting some of them wrong, and having those calls reviewed by someone who knows what good looks like. That&#8217;s how your best person learnt it in the first place. Nobody handed them a manual either.</p><p>That&#8217;s the part organisations skip. Not the writing down. The handing over of real decisions while the expert is still in the building to check them. It feels slower, because for a while it is. The expert would have made the call faster and better. But every decision they make themselves is a rep someone else didn&#8217;t get.</p><p>Wait until they leave and you still need the reps. You just pay full price for them, with nobody left to review.</p><p>So the useful question isn&#8217;t whether your star&#8217;s judgement can be written down. It&#8217;s how many of their decisions someone else made last month.</p><p><strong>The audit: where are you renting?</strong></p><p>Take the five capabilities your results depend on most. Not job titles. Things the organisation has to be able to do. For example: pricing the big deals, keeping the key regulator onside, or fixing the system when it breaks at month end.</p><p>For each one, write down every person who has made that call themselves in the last three months. Not watched it. Not prepared the slides for it. Made it.</p><p>Then look for four signs that the real number is lower than you think.</p><ul><li><p><strong>The leave test.</strong> The last time that person was away for two weeks, which decisions waited for them to come back? Nobody calls that a dependency. It gets called a busy fortnight.</p></li><li><p><strong>The escalation thread.</strong> Whose name is copied on every difficult email about it, even when they aren&#8217;t the one deciding?</p></li><li><p><strong>The private asset.</strong> The model only one person updates. The relationship where only one person has the number. The checklist that lives in one notebook.</p></li><li><p><strong>The one-way review.</strong> Other people do the work, but it always goes back to the same person to approve, and never the other way round.</p></li></ul><p>Now score each capability by the names left standing.</p><ul><li><p><strong>Two or more:</strong> you own it.</p></li><li><p><strong>One:</strong> you&#8217;re renting it, through a person.</p></li><li><p><strong>Zero:</strong> it has already gone, and nobody has noticed yet.</p></li></ul><p>Then start with the capability that scores lowest and matters most. Pick one decision the expert makes this month and give it to someone else, with the expert reviewing. Not a shadowing arrangement. The other person makes the call, and the expert checks it afterwards.</p><p>Do that once a month and the score moves. Leave it, and the score only moves the day someone hands in their notice.</p><p><strong>The line to remember</strong></p><p>If a capability lives in one person, you don&#8217;t own it. You&#8217;re renting it, until the day they leave.</p><p><strong>Watch or listen</strong></p><p>The full episode is at the top of this post. It opens with a question about the person you can&#8217;t afford to lose, and it&#8217;s the one I find hardest to tell, because I&#8217;m the one who left the working part alone.</p><p>You can also listen on <a href="https://podcasts.apple.com/us/podcast/built-to-absorb/id6806991972">Apple Podcasts</a> or <a href="https://open.spotify.com/show/7nwgw6S59jbshSNyLYsUeF">Spotify</a>, or watch on <a href="https://youtu.be/fEXDHa55-uo">YouTube</a>.</p><p>If you run the audit, reply and tell me how many of your five scored one or lower.</p><p><em>Built to Absorb. One problem, one fix, every week.</em></p>]]></content:encoded></item><item><title><![CDATA[The Phase 2 Problem]]></title><description><![CDATA[Absorption isn't change management. Your calendar can prove it.]]></description><link>https://www.builttoabsorb.com/p/the-phase-2-problem</link><guid isPermaLink="false">https://www.builttoabsorb.com/p/the-phase-2-problem</guid><dc:creator><![CDATA[Ricky Asemota]]></dc:creator><pubDate>Wed, 07 Oct 2026 05:01:00 GMT</pubDate><enclosure url="https://api.substack.com/feed/podcast/213660478/98e7bd13dbfd91602261d1b05b110697.mp3" length="0" type="audio/mpeg"/><content:encoded><![CDATA[<p>This week&#8217;s episode argues that the work has moved. For a decade the question was whether you could fund the next phase. Now it&#8217;s whether your organisation can absorb what the last one already bought. If you&#8217;ve watched or listened, you have that argument. I won&#8217;t repeat it here.</p><p>This issue does two things the episode doesn&#8217;t. It takes on the best objection I hear to the whole idea. And it gives you a test you can run on your own organisation this week, in about twenty minutes.</p><p><strong>The objection</strong></p><p>The fair challenge goes like this. Isn&#8217;t absorption just change management with a better name? Organisations have run change programmes for decades. Comms, training, champions, adoption plans. What&#8217;s new?</p><p>I don&#8217;t think it&#8217;s the same thing, and the difference decides what you fund.</p><p><strong>Change management usually arrives after the decision. </strong>The tool is bought, the date is set, and a workstream is stood up to bring people along. Its job is to help a decision that&#8217;s already been taken land as smoothly as possible. Done well, that&#8217;s valuable work.</p><p><strong>Absorption is a question you ask before the decision.</strong> Can this organisation hold this, now, on top of everything else it&#8217;s carrying? Who will be allowed to change how the work runs? Who owns it landing, and what will they stop doing to make room?</p><p>One is a workstream. The other is a constraint. A workstream gets a budget line. A constraint changes what you agree to buy.</p><p>You can run excellent change management on something the organisation had no room to absorb. Everyone attends the training. The champions are keen. The comms are clear. Six months later, well-trained people are back doing the work the old way, because nothing about their decisions, their incentives or their week has changed. That isn&#8217;t a failure of change management. It&#8217;s what happens when you ask it to fix a problem that was created before it started.</p><p>So if you&#8217;ve seen change management really work, check when it started. I&#8217;d bet it was before the purchase, not after it. At that point it had stopped being change management and become absorption.</p><p><strong>The test: twenty minutes with your calendar</strong></p><p>Strategy documents tell you which phase an organisation wants to be in. Calendars tell you which one it&#8217;s actually in.</p><p>Open the last four weeks of your leadership team&#8217;s diary. Put every recurring meeting into one of two piles.</p><p><strong>Pile one decides what to do.</strong> Strategy reviews. Investment committees. Approvals. Launch planning. These are the meetings that choose, fund and buy.</p><p><strong>Pile two makes what was decided work.</strong> Look for meetings like these:</p><ul><li><p>The adoption review, where someone looks at who is actually using the new thing and who has quietly gone back.</p></li><li><p>The blocker meeting, where the decisions holding a team up get made that week, not escalated to next month.</p></li><li><p>The check-in ninety days after go-live, when the launch glow has gone and the real usage is visible.</p></li><li><p>Time spent sitting with the teams doing the work, not hearing about it in a deck.</p></li></ul><p>Count both piles. In most leadership diaries I&#8217;ve seen, pile one wins by a distance. That made sense when the job was to fund and buy.</p><p>If you do find pile two, test it with three questions:</p><ul><li><p>Is anyone in the room from below the top two layers?</p></li><li><p>Does it end in named decisions, or in updates?</p></li><li><p>When did it last stop or change something?</p></li></ul><p>A pile two meeting that only hears updates from senior people is pile one in different clothes.</p><p>Then do the same with your targets. How many measure money spent or things launched? How many measure something actually being used, by the people it was bought for?</p><p>Last, your decision forums. When the new way of working collides with the old rules, where does a team take it? If the answer is up the chain, to a meeting that sits once a month, the decision rights haven&#8217;t moved, whatever the org chart says.</p><p><em><strong>If your calendar, your targets and your forums look the way they did three years ago, the slides have changed. The organisation hasn&#8217;t.</strong></em></p><p><strong>The line to remember</strong></p><p>Money moved at the speed of a memo. Capability moves at the speed of learning.</p><p><strong>Watch or listen</strong></p><p>The full episode is at the top of this post. It opens with a reorganisation I ran that worked perfectly on paper, and what it taught me about the gap between changing a structure and changing a company.</p><p>You can also listen on <a href="https://podcasts.apple.com/us/podcast/built-to-absorb/id6806991972">Apple Podcasts</a> or <a href="https://open.spotify.com/show/7nwgw6S59jbshSNyLYsUeF">Spotify</a>, or watch on <a href="https://youtu.be/r5BUClvt7V8">YouTube</a>.</p><p>If you run the calendar test, reply and tell me your split.</p><p><em>Built to Absorb. One problem, one fix, every week.</em></p>]]></content:encoded></item><item><title><![CDATA[Start Here]]></title><description><![CDATA[The most expensive gap hides inside the win]]></description><link>https://www.builttoabsorb.com/p/start-here</link><guid isPermaLink="false">https://www.builttoabsorb.com/p/start-here</guid><dc:creator><![CDATA[Ricky Asemota]]></dc:creator><pubDate>Tue, 29 Sep 2026 22:02:43 GMT</pubDate><enclosure url="https://api.substack.com/feed/podcast/218083999/359d5324e29807b069beb8e0e259a32f.mp3" length="0" type="audio/mpeg"/><content:encoded><![CDATA[<p>This is the first issue, so let me start with why this exists rather than ease into it.</p><p>Most writing about large transformations sorts them into two piles. The ones that worked, and the ones that failed. After more than a decade inside these programmes, I can tell you that is not the line that matters. The line that matters runs straight through the middle of the successful ones.</p><p>Because even the transformations that get counted as &#8220;wins&#8221; quietly lose a large share of the value they were meant to capture. That is the subject of this newsletter. Not the loud failures, the value that quietly escapes the wins.</p><p>Here is the pattern the whole show is built on, and it&#8217;s one I&#8217;ve watched again and again, not one I read in a report.</p><p>A business I worked with a few years ago, spent a fortune on a new system. Real ambition, a proper launch, the kind with a countdown running on a film. About a year in, I asked to see the usage data.</p><p>Most people had logged in exactly once. On the day of the training.</p><p>Nobody had been lazy. The money hadn&#8217;t been short. The thing worked. A fortune in tools sitting in the building like gym equipment nobody has touched since January.</p><p>It is tempting to blame the usual suspects. Talent. Money. The strategy itself. Most of the time none of those is it. All three are usually in the room. What is missing is quieter, and it has a name I have come to use all the time: <strong>ABSORPTION</strong>.</p><p>Absorption is the distance between what an organisation decides to do and what it can actually take in and make routine. You can buy a tool in a quarter. You can redraw an org chart in a weekend. But the real organisation moves much slower, because it lives in the incentives, the habits, and who is actually allowed to decide. None of that arrives with the purchase order.</p><p>So let me put the word plainly, because it is the whole show. Absorbing a capability is not buying it. It is the moment the new thing stops being a project someone is championing, and becomes, simply, how the work gets done. Until that happens, you do not own the capability. <em><strong>You are renting the appearance of it.</strong></em></p><p>And you cannot rush it because <strong>capability moves at the speed of learning, not the speed of money.</strong></p><p>The gap between what gets bought and what gets absorbed is where the value escapes. Not one dramatic failure, but a hundred small places, over months, where a good programme quietly loses what it was funded to deliver while everyone is still calling it a win.</p><p>That&#8217;s the whole subject of Built to Absorb. Every week takes one place the value escapes, and the one operating choice that plugs it. One problem, one fix. About ten minutes. Built to be used by Monday.</p><p>No theory you cannot act on. No company names. No pitch. Just the patterns, abstracted so they are safe to share and useful wherever you are sitting.</p><p>The failures aren&#8217;t the expensive part. The wins that never absorb what they paid for are.</p><p>You can also listen on <a href="https://podcasts.apple.com/us/podcast/built-to-absorb/id6806991972">Apple Podcasts</a> or <a href="https://open.spotify.com/show/7nwgw6S59jbshSNyLYsUeF">Spotify</a>, or watch on <a href="https://www.youtube.com/watch?v=CK2GW7srvB8">YouTube</a>.</p><p>Built to Absorb. One problem, one fix, every week.</p>]]></content:encoded></item></channel></rss>